A NSW Government website

Rising river alert – Snowy River below Jindabyne Dam

The NSW Department Climate Change, Energy, the Environment and Water today issued a rising river alert for the Snowy River between Jindabyne Dam and Dalgety in southern NSW for Monday 14 October 2024.

The river will rise due to the sixth high-flow event in a series of eight planned high-flow environmental releases from Jindabyne Dam to the Snowy River during 2024.

A daily flow volume of 2,923 megalitres will be released over 24 hours from midnight (00:00am) on Monday 14 October.

It is expected to see the river level at Dalgety rise by approximately 0.5 m. These levels do not include the effect of rainfall or wet conditions in the catchment, which may increase flow rates and water depths.

The flow rate will drop to a target of 1,471 megalitres per day on Tuesday 15 October.

The environmental benefits from this release are expected to be greatest between the dam wall and the junction with the Delegate River. However, the flow pulse will be noticeable further down into Victoria.

Natural tributary inflows will also contribute to water levels as the pulse moves down the Snowy River.

Water released from Jindabyne Dam may take approximately 6 to 10 hours to reach Dalgety Weir at this flow rate and around 3 to 4 days for the flow to arrive at Orbost in Victoria, subject to catchment conditions.

Landholders downstream of the Jindabyne Dam are advised to take all necessary precautions with stock, fencing and property in proximity to the river. As the release flows through the system people should refrain from entering or crossing swollen waterways.

Conditions will be closely monitored in the lead up to the release. Planned flows may be modified or cancelled subject to weather, environmental or operational conditions nearer to the release.

We will work closely with the NSW State Emergency Service and the Bureau of Meteorology to provide information to the community regarding the management of this release if required.

More information can be found at Snowy River increased flows.

Planned high-flow environmental water releases to the Snowy River will begin on Thursday 14 July.
A ‘rising river alert’ for the Snowy River downstream of Jindabyne Dam.